Menu
  • Home
  • About Us
    • Board of Directors
    • Machinery Details
  • Railway Project
    • South Central Railway
      • Current
      • Finished
      • Future
    • South Western Railway
      • Current
      • Finished
      • Future
    • Private
  • Cold Storage
  • Contact Us

  • All
  • Current
  • Current
  • Finished
  • Finished
  • Finished
  • Future
  • Future
  • Future
  • Private
  • SCR
  • SWR

portfolio-img-449

Kolar ? Chikkaballapur gauge conversion

Description: Proposed manual laying and linking of BG Track & Ballast works Location:
portfolio-img-447

Nandyal – Yerraguntla Bridge/Track Work

Description: Construction of Bridge No. 77 across Tingaleru Vagu, including earthwork approaches. Location: Jammalamadugu, Andhra Pradesh
portfolio-img-435

Hubli – Ankola Major Work

Description: Construction of major Bridge No. 42 as 5 x 18.30m  clear span with PSC  girders on well foundation. Location: Khalgatgi, Karanataka
portfolio-img-433

RCC Box Tunnel – RUB

Description: RCC Box Tunnel (RUB) by jack pushing Technique of size 12.00M x 5.00 M with a barrel length of 22 RM Location:  Tornagallu, Karnataka
portfolio-img-376

Kolar – Chikkaballapur Gauge Conversion

Description: Proposed manual laying and linking of BG Track & Ballast works Location:  Kolar, Karnataka Date of Allotment:13/07/2011 Date of Completion : 31/12/2013
portfolio-img-374

Gadag – Solapur Track Work

Description: Gauge Conversion from MG to BG –Execution of Earthwork, side drains, catch water drains and other Miscellaneous building works. Location:  Gadag, Karnataka Date of Allotment: 18.05.2007 Date of Completion:...
portfolio-img-371

RCC Box Tunnel – RUB (Jindal)

Description: RCC Box Tunnel (RUB) by jack pushing Technique of size 12.00M x 5.00 M with a barrel length of 22 RM Location:  Tornagallu, Karnataka
portfolio-img-369

RCC Box Tunnel – RUB (Ultratech)

Description: Construction of proposed Br.No.26 B (RUB), RCC Box over road by Box Pushing method Location:  Andhra Pradesh
portfolio-img-358

Hubli – Bellary section

Description: Jacketing of pires and abutments for strengthening of Bridges Location:  Bellary, Karnataka Date of Allotment: 08.10.2007 Date of Completion: April 2010
portfolio-img-356

Hubli – Kundagol Section

Description:  Construction and commissioning of crossing station between Hubli and Kundagol, including earthwork, track work and other misc. works Location:  Kundagol, Karnataka Date of Allotment: 02.04.2008 Date of Completion: 19.01.2010
portfolio-img-352

Hubli – Hebsur Doubling

Description: Proposed Construction of New subway in cast box pushing Rail and Roll method Location:  Hebsur, Karnataka Date of Allotment: 01.05.2008 Date of Completion: 30.05.2010
portfolio-img-350

Dharwad – Kambarganvi – 3

Description: Construction of major Br. No. 176 PSC girders with open foundation including approach earth work and Misc. Works Location:  Kambarganvi, Karnataka Date of Allotment: 22.10.2008 Date of Completion: 15.05.2011
  • 1
  • 2
  • 3
  • Last Page

About Us

Essvy group had its humble beginnings in 1980. We focused on undertaking railway infra projects for the railways and with the time we have included private giants such as like JSW steels, ultra tech cements. Subsequently, we also branched out into the development and promotion of cold storage facilities.

Menu

  • Home
  • Railway Projects
  • Cold Storages
  • Location
  • Conact Us

Contact Us

Essvy Group

Email : contactus@essvy.com
Phone : 040 ? 27814433
Address :Plot no: 68, 1st Floor,Radhaswamy Colony,Sikh Road, Sikh Village,Secunderabad-500009
  • Home
  • Railway Projects
  • Cold Storages
  • Location
  • Conact Us
Copyright 2014 Essvy Constructions Pvt Ltd.
Powered by Disside Design Studio